Cdot bmp manual






















Permanent BMP Operations Maintenance Manual, V2 June State of Hawaii Department of Transportation, Airports Division Page 2 Requirements The HNL MS4 NPDES Permit No. HI S requirements for this PBMP OM Manual are as follows. This manual focuses on site planning, source control, and stormwater treatment practices and is intended for use as a planning tool and design guidance document by the regulated and regulatory communities involved in stormwater quality management. The manual can be viewed in two ways: The complete manual or individual chapters. State of Hawaii Department of Transportation Highways Division Storm Water Permanent BMP Manual February v DEFINITIONS OF KEY TERMS (d) LIST – Under section (d) of the Clean Water Act, states are required to compile a list of impaired waters that fail to meet any of their applicable water quality.


Storm Drainage Criteria Manual, Volume 3-Best Management Practices, or the Colorado Department of Transportation's Water Quality Control standards. CDOT's ROW, because projects fully contained within CDOT's right of way fall under CDOT's own MS4 Permit. Where part of the project is within CDOT's ROW and part of the project is within. The Structural Worksheets are plan sheets of standardized structural details. For further information see the Bridge Design Manual Subsection In general, the CDOT Standard Plans (M S Standards) do not provide the standard details used for bridges. There are exceptions to this. For this reason, and because structural details are often dependent on the roadway design standards. This BMP may clog and require maintenance if a moderate to high level of silts and clays are allowed to flow into the facility. This BMP should not be located within 10 feet of a building foundation without an impermeable membrane. See Bioretention (BMP Fact Sheet T-3) of this manual for additional information.


Planning Design. Protecting water quality is an important part of the transportation planning process. CDOT has a process to consider and plan for all new highways or highway expansions. Water quality impacts are considered during several steps in the process. Depending on the extent of the project, one of several levels of environmental. Manual, Volume III. Construction Sites Program Goals This criteria manual has been developed in response to the "Construction Sites Program" requirements of the State of Colorado CDPS Permit # COS, issued to the City and County of Denver, with the following goals in mind. Program Goals: 1. BMP Selection for Stormwater Management. The purpose of this course is to teach CDOT employees best management practices (BMP) selection for project stormwater management plans (SWMP), erosion control and basics of hydrology and hydraulic engineering. The course is one in a series of courses to meet compliance requirement #26 of the Consent.

0コメント

  • 1000 / 1000